Draft — product data, images and project references are the property of the manufacturers (PetroBest / Flowbetter / OHZEC). Not for public distribution.
PETROBEST
Underground Gas Storage Injection and — 50-second specification reel

Underground Gas Storage Injection and Production Unit

After natural gas is processed, compressed and metered, it is injected into the underground gas storage facility.

Application

During gas production, the extracted gas is subsequently heated, choked, dehydrated, filtered, and metered before being delivered into the pipeline system.

In a typical surface processing train the sequence is: Wellhead → Separation → Treating → Metering → Pipeline.

Scope of supply

Capacity, design conditions and scope of supply are confirmed per project.

Design standards

Reference projects

Project references are taken from the PetroBest 2025 group catalogue.

Frequently asked questions

What is a underground gas storage injection and production unit used for?

After natural gas is processed, compressed and metered, it is injected into the underground gas storage facility. During gas production, the extracted gas is subsequently heated, choked, dehydrated, filtered, and…

Request a quotation

Send the design conditions, medium, flow rate and pressure range, and we will return a technical proposal and a price.

Request a quotation →