Separation / Metering / Gas Gathering Unit
In surface gathering and transportation projects for gas fields, associated gas, and shale gas, the gas gathering unit integrates the core process equipment of conventional gathering stations into one system.
Application
By employing various separation structures, it effectively removes solid and liquid impurities from the raw natural gas, while enabling gas gathering, separation, metering, safe venting, and drainage functions, etc.
In a typical surface processing train the sequence is: Wellhead → Separation → Treating → Metering → Pipeline.
Scope of supply
Capacity, design conditions and scope of supply are confirmed per project.
Design standards
Reference projects
- 2022 — 42Mpa metering and regulating skid for the Wenjisang Gas Storage project, Tuha Oilfield
- 2022 — Wen 23 Gas Storage of PipeChina West-East Gas Pipeline – TEG dehydration system - 10 million cubic meters per day
- 2024 — Caofeidian Offshore Gas Storage, Jidong Oilfield – integrated ground equipment - 30 million cubic meters per day
Project references are taken from the PetroBest 2025 group catalogue.
Frequently asked questions
What is a separation / metering / gas gathering unit used for?
In surface gathering and transportation projects for gas fields, associated gas, and shale gas, the gas gathering unit integrates the core process equipment of conventional gathering stations into one system. By…
Request a quotation
Send the design conditions, medium, flow rate and pressure range, and we will return a technical proposal and a price.